Key investment projects with completed construction in 2024
Facility | Construction period | Capacity commissioned | Commissioning volume (RUB million excluding VAT) | ||
---|---|---|---|---|---|
beginning | end | km | MVA | ||
Construction of a 10 kV distribution point (DP). Construction of four 10 kV cable lines (CL) running from the Plato 110 kV substation to the 10 kV DP | 2023 | 2024 | 9.91 | 0.00 | 369.03 |
Renovation of IKEA 110 kV substation | 2020 | 2024 | 0.00 | 80.00 | 1,140.16 |
Construction of the Novaya‑Zapadnaya‑2 110 kV PTL, tapped circuit I, and the Novaya‑Zapadnaya‑2 110 kV PTL, circuit II tapped to the Turgenevskaya substation | 2022 | 2024 | 7.71 | 0.00 | 626.07 |
Construction of 6 10 kV CLs from the IKEA 110/10 kV substation to 2 10 kV PD No. 1, to 2 10 kV PD No. 2, to 2 10 kV PD No. 3, Republic of Adygeya, Takhtamukaysky District, former Adygeysky state farm. The applicant is Stroizakazchik, a state budgetary institution of the Republic of Adygeya | 2023 | 2024 | 79.95 | 0.00 | 564.25 |
Construction of the Dorozhnaya – Pridorozhnaya 35 kV OTL to supply power to consumer terminals on the A‑289 Krasnodar – Slavyansk‑na‑Kubani – Temryuk motorway and the A‑290 Novorossiysk – Kerch motorway (stage 1, sub‑stage B) | 2022 | 2024 | 38.73 | 0.00 | 665.20 |
Renovation of the Ust‑Labinskaya – Otkormbaza 35 kV OTL, the Ust‑Labinskaya‑220 – Selkhoztekhnika 35 kV OTL, and the Ust‑Labinskaya 2 – Ust‑Labinskaya‑220 35 kV OTL to transfer part of the 35 kV load from the Ust‑Labinsk 220 kV substation to the Novo‑Labinskaya 220 kV substation | 2024 | 2024 | 1.45 | 0.00 | 37.17 |
Renovation of power grid infrastructure of the Novorossiysk 110/35/6/10 kV substation with adjacent OTLs, including renovation of the double‑circuit segment of the Kirillovskaya–Novorossiysk 110 kV OTL, 1 circuit tapped to the Lesnoy Port substation and the Novorossiysk–Novorosmetall 35 kV OTL with tap‑offs, on the section of spans between poles No. 2–3 for Rostransmodernizatsiya facility | 2023 | 2024 | 0.40 | 0.00 | 67.55 |
Renovation of power grid infrastructure of the Zapadnaya 35/6 kV substation with adjacent OTLs, including renovation of the Novorossiysk–Novorosmetall 35 kV OTL tapped to the Neftebaza and Lesnoy Port substations for Rostransmodernizatsiya facility | 2023 | 2024 | 0.56 | 0.00 | 61.58 |