Grid connection of generation facilities
During the reporting year, 116 contracts were in place for the grid connection of electricity generation facilities (including 101 microgeneration contracts). The total maximum capacity requested (excluding previously connected capacity) is 101.2 MW, and the cost is RUB 713.75 million excluding VAT. There were 80 contracts signed for the grid connection of generation facilities with a total capacity of 4.45 MW and a total cost of RUB 3.61 million (including 78 contracts for microgeneration facilities).